With the company of our CFI-I study dumps, you will find the direction of success. There is nothing more exciting than an effective and useful CFI-I question bank to study with for your coming exam. The sooner you use CFI-I Training Materials, the more chance you will pass the CFI-I exam, and the earlier you get your certificate. You definitely have to have a try and you will be satisfied without doubt.
You can hardly grow by relying on your own closed doors. So you have to study more and get a certification to prove your strenght. And our CFI-I preparation materials are very willing to accompany you through this difficult journey. You know, choosing a good product can save you a lot of time. For at least, you have to find the reliable exam questions such as our CFI-I Practice Guide. And our CFI-I praparation questions can help you not only learn the most related information on the subjuct, but also get the certification with 100% success guarantee.
>> Interactive CFI-I Practice Exam <<
Three versions of CFI-I exam guide are available on our test platform, including PDF version, PC version and APP online version. As a consequence, you are able to study the online test engine ofCFI-I study materials by your cellphone or computer, and you can even study CFI-I Actual Exam at your home, company or on the subway whether you are a rookie or a veteran, you can make full use of your fragmentation time in a highly-efficient way to study with our CFI-I exam questions and pass the CFI-I exam.
Topic | Details |
---|---|
Topic 1 |
|
Topic 2 |
|
Topic 3 |
|
Topic 4 |
|
NEW QUESTION # 92
Records regarding fire prevention inspections must include all of the following EXCEPT
Answer: C
Explanation:
Fire prevention inspection records must include essential details to ensure a proper record of the inspection process and enforcement of fire codes. According to NFPA 1, Fire Code, and standard fire inspection procedures:
Summary of violations found (A): This provides a clear record of noncompliance issues identified during the inspection.
Date of the inspection (B): The inspection date is mandatory for tracking inspection schedules and enforcement timelines.
Dates of the service of notices (C): These dates are necessary to document when violations were communicated to the responsible party.
Photographs of code violations (D): While photographs can be useful for documentation, they are not a mandatory requirement under NFPA standards for inspection records.
Reference:
NFPA 1, Fire Code, Chapter 1: Documentation requirements for fire inspection records.
NEW QUESTION # 93
Which of the following classifications of liquids indicates a flash point at or above 200°F (93°C)?
Answer: A
Explanation:
Comprehensive and Detailed Step-by-Step Explanation:
Liquid Classification by Flash Point:
Per NFPA 30 (Flammable and Combustible Liquids Code):
Class IC: Flash point below 73°F but above 100°F.
Class II: Flash point between 100°F and 140°F.
Class IIIA: Flash point between 140°F and 200°F.
Class IIIB: Flash point at or above 200°F (93°C).
Why Class IIIB Applies:
Class IIIB liquids, with higher flash points, are considered less flammable and less likely to ignite under normal conditions.
Other Options Explained:
Option A (Class IC): Flash point below 100°F.
Option B (Class II): Flash point below 140°F.
Option C (Class IIIA): Flash point below 200°F.
Summary:
A Class IIIB liquid has a flash point at or above 200°F (93°C).
NEW QUESTION # 94
What is the minimum fire resistance rating for the enclosure of floor openings connecting four or more stories in new construction?
Answer: A
Explanation:
The minimum fire resistance rating for the enclosure of floor openings that connect four or more stories is governed by NFPA 101, Life Safety Code. According to NFPA 101 (2021 edition), Section 8.6.5.1, vertical openings (such as stairwells, shafts, and floor openings) connecting multiple floors in new construction must meet specific requirements to prevent the vertical spread of fire and smoke.
For openings connecting four or more stories, the fire resistance rating must be a minimum of 2 hours.
The reasoning for the 2-hour rating is to allow sufficient time for occupant evacuation and firefighting operations while maintaining structural integrity.
Floor enclosures are required to be designed with fire-rated construction that can contain a fire and limit its spread between floors.
1-hour ratings are typical for smaller vertical openings involving fewer floors.
2½-hour ratings are more stringent and often seen in specific high-risk areas or older construction requirements.
Reference:
NFPA 101, Section 8.6.5.1: Fire resistance ratings for vertical openings in new construction.
NFPA 101 ensures that these ratings are consistent with safety objectives and risk levels posed by openings connecting multiple stories.
NEW QUESTION # 95
For flammable and combustible liquids, what is the number of control areas allowed on the 2nd floor above grade level of a building?
Answer: D
Explanation:
The number of control areas for flammable and combustible liquids is regulated under NFPA 30 and the International Fire Code (IFC). A control area is a designated area within a building where quantities of hazardous materials are allowed to be stored or used.
For the 2nd floor above grade level, the number of control areas is reduced compared to ground level due to increased risks related to fire containment, evacuation, and firefighting operations.
Specifically:
Ground floor: Up to 4 control areas are allowed.
2nd floor above grade: Up to 3 control areas are allowed.
The reduction ensures that hazardous materials are limited as the building height increases, thereby mitigating fire spread and potential risks.
Reference:
NFPA 30, Flammable and Combustible Liquids Code
IFC Table 5003.8.2: Control area limits based on building levels.
NEW QUESTION # 96
What is the minimum fire protection rating for a fire door in a 2-hour fire resistance-rated assembly that protects a refuse chute?
Answer: B
Explanation:
Fire doors in fire resistance-rated assemblies must have a fire protection rating proportionate to the rating of the assembly they protect. According to NFPA 80, Standard for Fire Doors and Other Opening Protectives, and NFPA 101, Life Safety Code:
For a 2-hour fire resistance-rated assembly, the fire door protecting an opening (like a refuse chute) must have a minimum fire protection rating of 1½ hours (90 minutes).
The reduced rating for the door (relative to the wall) is allowed because doors are tested to prevent fire spread through openings for their specified rating period.
½ hour (A) and 1 hour (B) are insufficient for a 2-hour assembly.
2 hours (D) exceeds the requirement but is unnecessary unless specified for high-risk openings.
Reference:
NFPA 80, Table 4.2.1.1: Fire door ratings based on fire resistance-rated assemblies.
NFPA 101, Section 8.3.4.2: Fire door requirements for vertical openings like refuse chutes
NEW QUESTION # 97
......
You can imagine that you just need to pay a little money for our CFI-I exam prep, what you acquire is priceless. So it equals that you have made a worthwhile investment. Firstly, you will learn many useful knowledge and skills from our CFI-I Exam Guide, which is a valuable asset in your life. After all, no one can steal your knowledge. In addition, you can get the valuable CFI-I certificate.
Latest CFI-I Test Blueprint: https://www.pass4test.com/CFI-I.html